Home › Services › Full Re-Roof
A re-roof inside a city ends with an inspection. In unincorporated Cypress it ends when the crew drives away, so everything you would want an inspector to check has to be written into the job before it starts.
First, the ACC approval. Most Cypress subdivisions require the Architectural Control Committee to approve the shingle line and color before a roof comes off, even when the new roof matches the old one. Crews that start without it leave the homeowner exposed to a violation letter over a roof that is already nailed down. How to submit to the ACC
Second, the written scope. It should name the shingle maker and product line, the underlayment, whether drip edge and starter strip are new, how valleys are handled, whether pipe boots and step flashing are replaced or reused, and how the attic will be ventilated. It should also say how rotten decking is found and priced, because nobody knows until the old roof is off.
Third, the warranty terms. The shingle maker’s warranty and the contractor’s workmanship warranty are separate documents with separate lengths. Many manufacturer warranties extend further only when a certified installer uses the maker’s matched components, so ask which tier the job qualifies for.
The most useful record of a re-roof is the one taken with the old roof off: the decking before and after any sheets are replaced, the underlayment going down, the flashing at walls and chimneys, the valleys. Ask the contractor to send them. In a city the inspector sees those stages; in Cypress, the photos are the only proof that anyone did.
Summer attic temperatures in the Houston area regularly pass 120°F, and shingles age faster over a hot, poorly vented deck. A re-roof is the cheap moment to fix ventilation: soffit intake that is actually open, ridge or box vents sized to match. On two-story production houses in Bridgeland and Towne Lake, the soffit vents are sometimes painted shut or blocked by insulation, and nobody looks until the roof is being redone.
Plywood or OSB decking that has been wet long enough goes soft and delaminates. A contractor cannot know how many sheets need replacing until the shingles are off, so a fair quote gives a per-sheet price rather than a guess. On a Copperfield or Fairfield house on its second or third roof, expect more of it than on a newer one.
Call and say which community you are in and roughly how old the roof is. The contractor you are connected with can walk the roof and put the scope in writing.